Mars Hill and r.o.i. Design have a 15-year relationship and we have worked on a variety of remodels as their building needs have changed.
In 2019, Mars Hill sold half of their building’s footprint to Grandville Public Schools, who were looking for space for their Early Education and After School Programs.
r.o.i. Design engaged Dwayne Masselink and Matt Shoffner of InterActive Studio, who have also previously worked with Mars Hill, to partner on the design and architecture of the remodel. r.o.i. Design led the design team and supported Mars Hill in the process. Mars Hill interviewed four contractors and decided on Erhardt Construction to complete the remodel.
Because of the challenges imposed by the COVID-19 pandemic, the Mars Hill project morphed many times. Budgets also impacted the phasing and scope of the work. Essentially, the scope of the project had to be divided into two phases.
The Phase 1 remodel included remodeling a mezzanine space for the church’s new offices, reconfiguring the middle school classrooms for preschool, reconfiguring preschool spaces for babies (nursery), and creating a complete separation from the Grandville Public School side of the building.
The old offices were separated by a mall corridor and the updated design has all staff in the same space for the first time in many years. While there was not enough room to give everyone private offices, they agreed to all have cubicle offices with private hotel offices being available for project-based needs and studies.
The mezzanine office remodel included new windows and views to the outside. They also created a large outdoor deck right off the lounge and break room area. The office includes a fireplace, several meeting spaces, a kitchen breakroom, and new restrooms.
Details that we really appreciate in the new mezzanine office include the reuse of the cedar siding reclaimed from the first floor demolition, the fireplace, the lighting plan and light fixtures, the curved wall and benches outside of the reception area, and the thoughtful furnishings provided by West Michigan Office Interiors.
Phase 1 also included adapting the buidling’s exterior to create a more appealing entrance for office staff and visitors. Phase 2 will include remodeling the elementary and preschool classrooms and the hallway areas.
A huge shout-out to Ken Sanders at Mars Hill for his care and patience during the project and to Erhardt Construction for their flexibility.
Click on thumbnails to view larger images.