(616) 459-3539

In Michigan, construction projects received the go-ahead start up again on May 6. r.o.i. Design had several jobs that we’re able to resume, most of which are working toward maintaining original deadlines with some schedule challenges. Here’s a summary of some of our construction jobs in progress.

Mars Hill Bible Church

We are partnered with InterActive Studio and Erhardt Construction in Phase 1 remodel of Mars Hill Bible Church’s offices and children’s ministry spaces. Mars Hill sold half of its building to Grandville Public Schools. Though the church isn’t sure when they can assemble for worship, they are optimistic that staff can return to new offices in August 2020.  We are grateful for the diligence and flexibility of Erhardt Construction who has had to manage a remote design team and customer while keeping the job site safe and productive.


Pennell CPA

We are partnered with Pinnacle Construction in the office remodel for Pennell CPA. For this project, we opened up much of the enclosed space to create a more flexible workplace for this growing accounting firm. We are managing the design, with the help of TJA Architects. The goal is for the office to be move-in ready at the end of June. Like many companies, Pennell CPA has had many staff working from home, and they look forward to being able to gather in a larger space that will comply with current requirements for social distancing. Kudos to Pinnacle for keeping this project on track, where, at this writing, finishes are being applied and cabinets installed.


Total Fire Protection

We are partnered with First Companies and Dixon Architecture in the design of Total Fire Protection’s new facility. The new construction includes a large manufacturing and distribution warehouse and a two-story corporate and sales office. Total Fire Protection builds fire protection sprinkling systems, hazard specialty services, and system monitoring. They have outgrown their space on Kendrick Drive and are looking forward to a July move-in. In addition to their space, the building has tenant space making the overall build-out a huge footprint. First Companies are reporting that finishes are being installed, decorative lighting is showing up, and the cabinetry is being installed.


Grand River Bank

We are partnered with Dixon Architecture and BDR Construction on a new construction project at 50 Crahen Avenue in Ada, Michigan. Grand River Bank is the first-floor tenant of this building, which is their second location in West Michigan. This office will duplicate most of the services that they offer in their Grandville branch. The goal is for the bank to be operational this fall while being strategic and methodical about how to keep employees and customers safe. The COVID-19 pandemic and consequential social distancing requirements created a need for a little redesign, which is being addressed now and shouldn’t postpone their entry into the marketplace.


Evolution Wealth

The r.o.i. Design team connected with Ryan Bassett from Evolution Wealth through our mutual friend, BluHouse Realtor Duke Gray. Due to the growth of Ryan’s financial consulting business, he was seeking a space that could reflect his brand and values, while accommodating more new customers. Working with the landlord’s team of remodelers, we helped him imagine a new layout and select finishes. The goal is for Evolution Wealth to occupy its new space in July.